Besides roads and integrated roads of large volumes in residential neighborhoods, the
management, co-ordination and overseeing of
intercity bypass roads and Dept.of Public
Works roads:

 

Rehovot Eastern Bypass
Stage 2 including acoustic walls.

 

Modi’in - Road 431
Continuation road of Road 431 from the Anba 
interchange up to the
center of Modi’in (internal Road 2); a double lane 
highway of a length
of about
4.5 km, including 5 bridges.
- One bridge over Road 200.
- Three bridges over Internal Road 4.
- Bridge at the Anba interchange, a stress-laminated double bridge in 
   a length of
240 m.

BEFORE



                AFTER




Bein Hagvulot Road
From Road 20 up to Road 4 between Holon and 
Rishon Lezion -
Ayalon Freeway - Execution planning management.
Rishon Lezion Eastern Bypass
Including supporting walls and acoustic 
wall up to an including the join
to Dept. of Public Works Road 44 - 
Executed, completed and handed
over.
Fryman and Shmotkin Road
In the Old Industrial Area in Rishon Lezion.
 

Road 20 North - Ayalon Highways
Road 531 up to the northern side of Road 57 at Avihail - coordination,
statutory design for the National 
Infrastructure Commission and
examination of alternative designs, 
oriented for public transport and
the examination of economic viability.

Achisemech Interchange Road 40 Lod
Management, planning and 
execution.
Einstein Interchange in Netanya
Management of the detailed Urban 
Building Plan planning for Stage 1
of the interchange.

Ahdut Bridge  - Netanya
Promotion of a ramp on the eastern side of Ahdut bridge and
promotion planning of a ramp on the western side of Ahdut bridge to
facilitate the entry and exit from east Netanya.

Nachalat Yehuda Northern Bypass Road
From Road 4 to Road 412 - management of the planning for
execution.

Expansion of Dept. of Public Works Road 453
From El Al Junction to Shoham.
Northern Bypass - Nahlat Yehuda - from road 4 till reoad 412
Management, planning and execution.
Joining road and circle East Netanya to Road 561
Management, 
planning and execution.
Beit Dagan interchange
Management, coordination and supervision of the interchange at the intersection of roads 44-412, from the
statutory coordination.
Habad interchange
Terminal 3. Management, coordination and supervision of the Highway 1 interchange, direct access to 2000
Ben Gurion Airport.
Terminal 3
From the statutory coordination.
Southern BRT
Project manage of southern BRT from Mada junction, North Rehovot-Nes Ziona-Rishon Lezion-Beit Habad
junction along road 44 to Holon junction.
Budget of about 6 million NIS from the pre-planning stage.
Railroad track from Erez passageway to Tarkomia
Management, coordination, concentration and control of the design of the tracks for the Israel Railways.
Railroad track from Beer Sheva to "Ir a Baadim" (Army Training Bases) 
Management, coordination, concentration and control of the design of the tracks for the Israel Railways.